Research on the Safety Risk Management of the Operation of the Long River-crossing Tunnels Based on Fuzzy Analytic Hierarchy Process Evaluation Method
编号:1838 访问权限:仅限参会人 更新:2021-12-03 14:40:52 浏览:223次 张贴报告

报告开始:暂无开始时间(Asia/Shanghai)

报告时间:暂无持续时间

所在会场:[暂无会议] [暂无会议段]

暂无文件

摘要
The safety risks in the operation process of the long river-crossing tunnels were identified systematically and comprehensively, and the risk assessment index system was established by categorizing, merging and integrating the factors of people, vehicles, tunnels, environment and management. Combined with the safety science and system theory, the complex safety risk factors were refined. Then the analytic hierarchy process was used to determine the weight of the index, and the gray correlation theory was used to analyze and calculate the value of the index. Some reference and ideas can be provided for the operation safety risk management of the long river-crossing tunnels.
关键词
CICTP
报告人
Qinkai Luo
China Design Group Co., Ltd.

稿件作者
Qinkai Luo China Design Group Co., Ltd.
发表评论
验证码 看不清楚,更换一张
全部评论
重要日期
  • 会议日期

    12月17日

    2021

    至

    12月20日

    2021

  • 12月16日 2021

    报告提交截止日期

  • 12月24日 2021

    注册截止日期

主办单位
Chinese Overseas Transportation Association
Chang'an University
联系方式
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询