Nearly Full-Length Scour of Suction Pile: A Case Study
编号:28 访问权限:仅限参会人 更新:2025-11-03 17:12:16 浏览:4次 口头报告

报告开始:暂无开始时间(Asia/Shanghai)

报告时间:暂无持续时间

所在会场:[暂无会议] [暂无会议段]

暂无文件

摘要
Submission Category: Case History, Lessons Learned, and General Practice Scope Suction pile is a robust foundation system that offers significant lateral and axial capacities with minimal displacement. While scour around suction pile is generally not a concern in deepwater; scouring becomes a considerable risk in shallower water caused significant current and wave actions in cohesionless sediments. A case history is presented where significant scour of a suction pile supporting a SPM (Single Point Mooring) PLEM has been observed in a relatively short span of time, which considerably exceeded predicted scour, requiring emergency mitigation. Methodology During detailed design, a considerable scour was predicted using conventional analytical methods using site-specific geotechnical data and nearby metocean data. It was decided by the project team not to install scour mitigation measure during construction. As part of scour mitigation plan, post installation periodic surveys were conducted for the subsea infrastructures including the PLEM. These surveys reveal progression of scour around suction pile supporting the PLEM. Several widely used analytical approaches were used to back calculate the observed scour. Observations The observed scour exceeded the predicted scour depth considerably nearly reaching full depth. The back-analysis of the observed scour revealed applicability of available analytical solutions for complex structures such as suction pile supported PLEM structure. Proper assessment and use of input parameters are essential for reasonable prediction of scour around complex subsea structures. Novel Information The case study presents the measured progression of scour around suction pile supporting PLEM in shallow water which are scarce in the public domain. The applicability of the available semi empirical and analytical solutions for prediction of scour around complex structures are presented. Lessons learned from this study should be beneficial for the design and project team involved in similar projects.
关键词
暂无
报告人
Hadi Suroor
Energy Geotechnics

稿件作者
Hadi Suroor Energy Geotechnics
Shovon Chowdhury Associates of Professional Services, Ltd.
发表评论
验证码 看不清楚,更换一张
全部评论
重要日期
  • 会议日期

    11月04日

    2025

    11月07日

    2025

  • 10月20日 2025

    摘要截稿日期

  • 10月20日 2025

    初稿截稿日期

  • 10月30日 2025

    初稿录用通知日期

  • 11月07日 2025

    注册截止日期

主办单位
Hehai University
Chongqing Jiaotong University
承办单位
Hehai University
Chongqing Jiaotong University
联系方式
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询