Knowledge-Graph-Constrained Multi-Agent Reinforcement Learning for Adaptive Daily Scheduling in Residential Construction
编号:165 访问权限:仅限参会人 更新:2026-11-10 17:00:16 浏览:8次 Online

报告开始:2026年11月20日 16:15(Asia/Kolkata)

报告时间:15min

所在会场:[S4] Artificial Intelligence and Intelligent Computing [S4-4] Artificial Intelligence and Intelligent Computing

暂无文件

摘要
The phenomenon of construction delays is a well-known cause of cost overruns, and the problem is usually triggered by something as simple as the illness of a group of workers, bad weather, or any other reason why the plan must deviate from the predetermined schedule. Learned planners solve this problem by coming up with an entirely new plan and rarely do they promise that the learned action takes precedence into account. This work frames daily repair as a multi-agent decision problem on a single 79-task residential construction instance, where a knowledge graph is compiled into a structural feasibility mask that gates every action so that whatever schedule the policy produces is feasible by construction, not by hope. A shared-parameter policy trained with Centralized Training with Decentralized Execution and Proximal Policy Optimization (CTDE-PPO) under heavy disturbances recovers a mean of 20.48 days relative to a static-replay baseline (240.84 ± 9.05 vs. 220.36 ± 7.50 days), with zero constraint violations and instability an order of magnitude below a reactive heuristic; the 95% confidence interval on recovery, [11.2, 29.8] days, excludes zero. Disabling the mask, by contrast, produces thousands of violations almost immediately. A Constraint Programming-Boolean Satisfiability (CP-SAT) solver builds a stronger static plan than either baseline, yet the rescheduler still closes much of that gap online, through nothing more than daily adaptation. Together these results point to a workable path for bringing guaranteed-feasible Multi-Agent Reinforcement Learning (MARL) into operational construction management.
关键词
multi-agent reinforcement learning, knowledge graphs, construction scheduling, feasibility masking, proximal policy optimization, project rescheduling
报告人
Vasuki G
Student Karunya Institute of Technology and Sciences

稿件作者
Vasuki G Karunya Institute of Technology and Sciences
Grace Mary Kanaga E Karunya Institute of Technology and Sciences
发表评论
验证码 看不清楚,更换一张
全部评论
重要日期
  • 会议日期

    11月20日

    2026

    至

    11月22日

    2026

  • 10月31日 2026

    初稿截稿日期

  • 11月07日 2026

    提前注册日期

  • 11月22日 2026

    注册截止日期

主办单位
United Societies of Science
承办单位
Pondicherry University
协办单位
IEEE Section
IEEE Madras Section
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询